Radon work will be done in a week or two, followed by termite treatment probably a week later. That leaves a massive electrical job for us to do once we settle on the house (during which we will likely be camping out at the Royal street property). During, or perhaps shortly after, we will be doing the floors, any plaster & drywall repair needed, install cable or DSL, and then finish with a healthy layer of paint.
If settlement moves up 2 weeks, we may even be done for thanksgiving.